Back up power generation

This project is being considered for all main pump stations to ensure the deliverability of water during potential power outages during peak demand (summer).

A diesel-powered generator was successfully commissioned in January 2018 at the Curlwaa Pump Station.

Diesel-powered generators were successfully commissioned in September 2019 at the Coomealla Pump Station.

A generator requiring noise pollution mitigation is being considered for the Buronga Pump Station.

Alternate power generation

A solar prefeasibility study was conducted in 2016 which concluded that solar panels were feasible for the Curlwwa pump station only.

Western Murray Irrigation is currently investigating the installation of rooftop-mounted solar panels for that station.